Forsyth Road Duplication between Ashcroft Avenue and Sayers Road

Date: 
Tuesday, 7 August, 2018

Summary

This report evaluates tender submissions for Forsyth Road Duplication between Ashcroft Avenue/Old Geelong Rd and Sayers Road.

The project involves excavation and construction of road pavement including asphalt paving, kerb and channel, line marking, concrete path, stormwater drainage, traffic signal installation, public lighting and associated nature-strip works.

As part of this project, two new additional lanes will be constructed along with a new signalised intersection at Waterways Boulevard and pedestrian operated signals at the Federation Trail crossing.

Key Issues

  • Conformance with tender requirements.
  • Provision of best value for money.

Background

The project consists of the duplication of Forsyth Rd between Ashcroft Avenue/Old Geelong Rd and Sayers Road and the reconstruction of the existing carriageway. This section of road is prone to traffic congestion due to the surrounding growth. 

The road forms a strategic link to the Freeway interchange on one side and has a connection to the main east-west arterials on the other. The main arterial to the north is Leakes Road which is currently being upgraded as part of the Western Roads Upgrade (WRU). It will also link into the adjoining WRU project which upgrades the southern section of Forsyth Road. Refer to attachment for the strategic planning of Forsyth Rd. This project relates to Section 2 and 3.

This project will see Forsyth Rd fully duplicated between Old Geelong Rd and Leakes Rd providing great benefits to the community such as increased traffic safety and capacity and decrease in traffic congestion for motorist heading onto the Princes Freeway.

Social Implications

Road infrastructure constructed by this project will improve the vehicle traffic and pedestrian safety, image, accessibility and presentation of the area. Some traffic delays are expected during construction.

Environmental Implications

There will be some minor environmental implications such as noise/dust pollution and some disruptions to the community in regards to traffic management.

Economic/Employment Considerations

Employment for workers living in the Western Region of Melbourne could be facilitated through this project because materials are generally sources locally. A lot of sub contract works are generally sourced locally. This will also provide business opportunities for local shops.

Recommendation

That Council:

  1. Award contract C1885/17 – Forsyth Road Duplication between Ashcroft Avenue and Sayers Road to Negri Contractors ACN 006337239 for the sum of $7,540,425.27 (GST inclusive) including Negri Contractors accepting the financial risk mitigation measures as per the financial assessment section of this report.
  2. Authorise the Director of City Operations to approve variations and contingencies to contract C1885/17 – Forsyth Road Duplication between Ashcroft Avenue and Sayers Road up to the sum of the contingency provisions in accordance with the Financial Information section in this report.
  3. Sign and seal the contract.
  4. Advise all tenderers accordingly.

Motion

Crs John Gibbons / Aaron An

That Council:

  1. Award contract C1885/17 – Forsyth Road Duplication between Ashcroft Avenue and Sayers Road to Negri Contractors ACN 006337239 for the sum of $7,540,425.27 (GST inclusive) including Negri Contractors accepting the financial risk mitigation measures as per the financial assessment section of this report.
  2. Authorise the Director of City Operations to approve variations and contingencies to contract C1885/17 – Forsyth Road Duplication between Ashcroft Avenue and Sayers Road up to the sum of the contingency provisions in accordance with the Financial Information section in this report.
  3. Sign and seal the contract.
  4. Advise all tenderers accordingly.

(CARRIED)

Photo Gallery

  • 2017, Wyndham Tech School construction start

    2017, Wyndham Tech School construction start

  • 2017, Support local business

    2017, Support local business

  • 2017, Support community event

    2017, Support community event

  • 2017, Support community events

    2017, Support community events

  • 2017, Target HQ construction started.

    2017, Target HQ construction started.

  • 2017 Wyndham project won the National Winner for Excellence in Local Government award.

    2017 Wyndham project won the National Winner for Excellence in Local Government award.

  • 2017, Great to support the completion of the Greening the Pipeline pilot park.

    2017, Great to support the completion of the Greening the Pipeline pilot park.

  • 2017, Point Cook Community Learning Centre extension announcement.

    2017, Point Cook Community Learning Centre extension announcement.

  • 2017, Supporting Wyndham Sports Fest - Youth Cup

    2017, Supporting Wyndham Sports Fest - Youth Cup

  • 2017, supporting Western Chances event

    2017, supporting Western Chances event

  • 2017, supporting VicPolice, Wyndham needs more police.

    2017, supporting VicPolice, Wyndham needs more police.

  • 2017, speak to support the community to against the Youth Detention Centre in Werribee South

    2017, speak to support the community to against the Youth Detention Centre in Werribee South

  • 2017, Point Cook Alamanda estate Pirate Ship park (Bayview Park) reopen

    2017, Point Cook Alamanda estate Pirate Ship park (Bayview Park) reopen

  • 2016, great o support a fantastic music event in Saltwater Coast

    2016, great o support a fantastic music event in Saltwater Coast

  • 2016, discussed community issues with the audience at a radio station.

    2016, discussed community issues with the audience at a radio station.

  • 2016, it was a great experience to participate as a committee member of council's first Cultural Diversity portfolio.

    2016, it was a great experience to participate as a committee member of council's first Cultural Diversity portfolio.

  • 2016, meeting at UniMelb after work with passionate people across Victoria to discuss school issues.

    2016, meeting at UniMelb after work with passionate people across Victoria to discuss school issues.

  • 2016 Providing research evidence to council on the school shortage issue

    2016 Providing research evidence to council on the school shortage issue

  • 2016, at Williams Landing station, discussing with local bus drivers regarding transport issues.

    2016, at Williams Landing station, discussing with local bus drivers regarding transport issues.

  • 2016, at the Multicultural Entrepreneur Awards

    2016, at the Multicultural Entrepreneur Awards

  • 2015, Community Panel Workshop. Give feedback to council.

    2015, Community Panel Workshop. Give feedback to council.

  • 2015, help organised community BBQ.

    2015, help organised community BBQ.

  • 2015, community dinner and consultation session at council.

    2015, community dinner and consultation session at council.

  • 2014, organized the first Chinese community meeting in Point Cook Community Learning Centre, supported by councillor and council officer.

    2014, organized the first Chinese community meeting in Point Cook Community Learning Centre, supported by councillor and council officer.

  • 2014, did city plan and annual budget submission presentation in council chamber as a resident

    2014, did city plan and annual budget submission presentation in council chamber as a resident

Pages